Project Name Project Description Contract Value Date Completed Comments
Capital Circle SE (E1) Connie Drive to Tram Rd Blueprint 2000 Approximate 4.4 mile Design Build project that reconstructed an existing two lane roadway in southeast Tallahassee to a six lane divided highway $41,355,939.92 2008 Major items of work: Earthwork, Limerock, Aspahlt, Signalization, Retaining Walls, Stormwater and sanitary Sewer Construction, Water, Reuse Water, and the repair and upgrade of a 42" force main. Additionally, there was extensive street lighting and landscaping
Capital Circle NW (from S of SR10 to SR 8 W) 21972215201 and 21972215202 Approximate 2.8 mile project that is reconstructing two existing State Roads in Tallahassee to a six lane divided urban section $25,462,923.43 2007 Major items of work: Earthwork, Asphalt Paving and Asphalt Base, Signalization, Retaining Walls, Stormwater, Landscaping, and a JPA to construct City of Tallahssee Water
Southwood Unit 29/30 137 lot subdivision in the Southwood development requiring 2 large ponds to be constructed along with all infrastructure: curb and gutter, base and paving, sanitary sewer, storm drain, water, and landscaping. $7,133,548.02 2008  
Capital Circle SE ( Park Ave to Connie Drive) FDOT 21977715201 and 21977715202 1.1 mile project that reconstructed a two lane roadway in Tallahassee to a six lane divided urban section. $7,771,402.31 2005 Major Items of Work: Earthwork, Limerock, Asphalt, Signalization, Lighting, Landscaping and retaning walls.
East Park Avenue Phase II City of Tallahassee City:0197-03-EA-BC Approximately 3/4 of a mile in length. The project required two large ponds consisting of over 100,000 yards of export dirt. A vita $4,918,296.00 2005 Major items of work: Box Culvert Construction, Earthwork, Limerock, Asphalt Paving,Signalizaton, Lighting, Landscaping and retaining walls.
Blair Stone Road Phase II NE Area Drainage and Roadway Improvements City of Tallahassee Approximately 1.8 miles in length, which involves the construction of a new six lane urban roadway that will have several tie ins to existing city roads $17,877,852.35 2004 Major items of work; Construction of a new bridge, Box culvert, earthwork, Limerock, Asphalt Paving, Signalization, Lighting, Landscaping, and Retaining Walls.
Blair Stone Road Phase I Segments 1 & 2 (Park Ave to Miccosukee Rd.) City of Tallahassee Approximately 1.7 miles in length, which involves the construction of a new six lane urban roadway that will have several tie ins to existing city roads $11,272,784.93 2004 Major items of work; Earthwork, Limerock, Asphalt Paving, Water and Sewer Installation, Major Storm Retention, Signalization, Lighting, Landscaping, and Retaining Walls.
East Park Avenue Phase I City of Tallahassee Approximately 3 miles in length. The project widened the existing two lane roadway to a four lane urban section. $10,874,454.60 2003  
SR 371 (Orange Ave Intersection) FDOT: FPN 21978015201 Intersection Reconstruction near the Tallahassee Airport $1,080,289.88 2003 Major Items of Work: Asphalt, Signalization, and storm sewer
SR 61 Thomasville Rd (Woodbine to Kinhega) FDOT: FPN 21977315201 Approximately a 3 mile project that involved the reconstruction of a two lane roadway into a six lane urban section $18,989,914.00 2000 Project had severe environmental constraints as well as full time county environmental inspectorand the project was completed with no violations.